Laserfiche WebLink
ROAOAgLE EOUIPMENT sheet 2 of 2 <br />Machine <br />Description Total <br />CosUhour/unit Fleet Size <br />(No. units) Haul Trip <br />CosUhrlfleet Return Trip <br />CosUhr/fleet <br />-Flatbed Truck, 4x2, 30K GVW $47.52 1 $47.52 $47.52 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $47.52 $47.52 <br />EQUIPMENT HAUL DISTANCE and TIME <br />Nearest major city or town within project area region : Craig <br />Transportation Cvcle Time : Non- Total one-way travel distance : 60.0 miles <br />Roadable Roadable Average travel speed : 50.0 mph <br />Haul time (hours) = 1.20 1.20 <br />Return time (hours) = 1.20 1.20 <br />Loading time (hours) = 0.50 NA <br />Unloading lime (hours) = 0.50 NA <br />Subtotals = 3.40 2.40 <br />721.40 <br />$114.04 <br />Total non-roadable mob/demob cost <br />' lwo round inps with haul rig <br />Total roadable mob/demob cost" <br />"one round trip, no haul rig <br />JOB TIME AND COST ~ Total job time : ~ 6.80 hours <br />Total job cost : $1,835 <br />