My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE63191
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE63191
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:09:22 PM
Creation date
11/20/2007 7:53:15 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2007058
IBM Index Class Name
Permit File
Doc Date
11/6/2007
Doc Name
Initial reclamation liability estimate
From
DRMS
To
TMS Consulting
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />Task # : 01a <br />Date : 11/05/2007 <br />User: THM <br />State :Colorado <br />County : Mo(tat <br />Site :Sheehan Pit <br />Permit/job # :M--2007-058 <br />Abbreviation :none <br />Filename : M058-O1 a <br />Agency or organization name :DRMS <br />Permit or other job action :Initial Bond Calculation <br />Task description :Rip and Contour 3.0 Acres <br />HOURLY EQUIPMENT COST <br />MATERIAL QUANTITIES <br />Basic machine :Cat D8R Series ll - 8SU (2001 Horsepower : 310 <br />Blade type :Semi-Universal <br />Attachment no. 1 :ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 :3-shank ripper <br />Selected estimating method : Area <br />Alternate methods - <br />Seismic : NA NA Load factor : NA Bank volume : NA BCY <br />Area : 3.00 acres Rip depth (ft) : 1.00 Volume : 4,840 BCY or CCY <br /> <br />Source of estimated quantity :Maximum disturbed area stated in application. <br />Source of estimated load factor : NA <br /> <br />HOURLY PRODUCTION <br />Alternate methods - Job Condition Correction Factors - <br />Seismic : Seismic velocity : NA feeUsecond Unadjusted production <br />Unadjusted production : NA cu. yds./hour per selected method : 1,134.86 cu. yds./hour <br /> <br />Area : Avg. ripping depth : 1.00 feeUpass Site altitude : 6,600 feet <br />Average ripping width : 7.08 feeUpass Altitude adjustment : 1.00 (Cat HB) <br />Average ripping length : 100.00 feeUpass Job efficiency factor : 0.83 (1 shifUday) <br />Average dozer speed : 88.00 feeUminute Net job correction : 0.83 multiplier <br />Average maneuver time : 0.25 minutes/pass <br />Production per unit area : 0.703 acres/hour Adjusted unit production : 941.94 cu. yds./hour <br />Unadjusted production : 1,134.86 cu. yds./hour Adjusted fleet production : 941.94 cu. yds./hour <br /> <br />JOB TIMEAND COST <br />Fleet size : 1 dozers) Total job time : 5.14 hours <br />Unit cost : $0.149 per cu. yd. Total job cost : $723 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.