Laserfiche WebLink
<br />• ESHIBIT E - RECLAMATION PLAN <br />Once a permit has been issued, reclamation of the old borrow <br />area will commence. Reclamation will be performed in accordance <br />with the requirements of Rule 6: Reclamation Performance <br />Standards. The area will be graded, topsoiled (if available), <br />and seeded. The only portion of this area that will not be <br />reclaimed at this time will be areas set aside for mining <br />equipment, screen deck, stockpiling, and the haul road. This is <br />estimated at approximately 5 of the 14.5 acres. <br />Reclamation will occur concurrently with mining in an adjacent <br />area. After topsoil is removed and mining commences in a 5 acre <br />area, the previously mined area will be graded, topsoiled, and <br />seeded. The land will be reclaimed to its pre-existing <br />classification of rangeland. Slopes will be graded to no steeper <br />than 3H:lV. Most of the pit area will be graded to flat or <br />moderately sloping topography. Unusable materials (predominantly <br />silt or clay fines) left over from the screening process will be <br />used as backfill for the final reclamation grade. Swales will be <br />shaped to drain into the undisturbed drainages to the north, <br />east, and soutl- of the disturbed area. The area will be <br />predominantly flat but some topographic shaping will be <br />implemented in certain areas where the mining process was not as <br />deep. The final reclamation grade of one mining area will be <br />designed to meet the proposed final reclamation grades of the <br />adjacent 5 acre mined area. <br />Once the final reclamation grade is completed, topsoil will be <br />replaced to a depth of 5 inches or more, if available. This will <br />be dependent upon the topsoil balance for the entire site. <br />Typically existing topsoil in this area is thin and generally <br />less than 5 inches. If available, some salvaged topsoil will be <br />used to reclaim the 14 acres in the old borrow pit area. <br />• Once the area is topsoiled, the site will be seeded in <br />