Laserfiche WebLink
:r <br /> <br />7. If the design and bonding for the inlet and outlet structures are to be postponed until later in the <br />mining process, GJP must indicate how the concerns of the USFWS will be satisfied, in the event that <br />mining is terminated at any point during the operation. This Division must ensure that adequate bond <br />is in place to reclaim the site accordingly. e.g. construction of alternate inlet and outlet structures or <br />systems. <br />8. Please provide confirmation that the CDOW is aware of the eagles nest on the island, and address <br />any concerns they may have regarding it's presence. <br />The reclamation cost estimate for this site will be calculated upon receipt of GJP's responses to this letter. <br />If you need additional information, please contact me at the Division of Minerals and Geology, Durango <br />Field Office, 484 Turner Drive, Building F, Suite 101, Durango, CO 81301, phone no. 970-247-5062. <br />Sincerely, <br />-'SCI" v~ <br />Steve S. Shuey <br />Environmental Protectio pecialist <br />enclosure <br />