Laserfiche WebLink
<br />CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Agency or organization name : DMG <br />Task 8 : 002 State ~COlorado PermiUjobp : M•2000-086 <br />Dale : 1 7/21/2000 County :Park Abbreviation :none <br />User: LDO Site :Anlem Gravel Filename:M088-002 <br />Permit or other job action :New permit bond calculation <br />Task description :Grade pit lloor and permit perimeter slopes cell A <br />HOURLY EQUIPMENT COST Basic machine:Car OBN (7996) Horsepower: 285 <br />Blade type :Universal <br />Attachment no. 1 : FOPS Cab Shrfl basis : 1 per day <br />Attachment no. 2 : NA <br /> Utilization % Cost data source : (CRG) <br />Cost Breakdown : Ownership cosUhour : $3537 NA <br />Operating cosVhour: $55.90 100 <br />Ripper op. cosUhour: $0.00 NA <br />Operator cost/hour: $23.12 NA <br />Total unit cosUhour: $114.39 Total lleet cost/hour: $114.39 <br />MATERIAL QUANTITIES <br />Initial <br />volume: 7,260 CCY <br />Source of quantity take-oR : Exhibi( E <br />Source of est. swea factor:caf hnobk <br />HOURLY PRODUCTION <br />Avemge push distance: 55 leer <br />Unadjusted Koury production : 148/ LCY/hr <br />Matenal consistency description <br />Panty consolidated stockpile <br />Average Dush gradient : 5.00 % (negJ <br />Average site altitutle : 9,000 leer <br />Material weight: 3.250 Ibs/LCV <br />Material weight description <br />Gravel - Prlrun <br />Loose <br />voume: 9,039 LCY <br /> <br />Operator skill : <br />0.75 Source <br />/avg.) <br />Matenal consistency : 1.70 (Cal HB <br />Dozing methotl: 1.10 (50%sl, <br />Vsibiliry: 7.00 (avg.J <br />Job e8iciency : 0.83 (lshifUda <br />Spoil pile : 0.70 /fnd~mQ <br />Push gradient: 1.11 (Cal HB <br />Alblude: 100 (Cd(HB <br />Material weight : 0.71 (Cal HB, <br />Blade type : 1.00 (S or UJ <br />Net correction : 0.42 <br />Atljusted unit production : 616.37 LCV/hr <br />AOIUSIed fleet protluction : 616.31 LCY/hr <br />JOB TIME AND COST <br />Fleet size: 1 Dozers) <br />Unit cost : $O. iB6 /LCV <br />Total job time : 14.67 Hours <br />Total job cost : $1,678 <br />Swell <br />lactor: /.245 <br />