Laserfiche WebLink
<br />CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT I DENTIFICATION <br /> Agenry or organization name : DMG <br /> <br />Task q: 001 Slale:Colorado Penn~Vobp :-2000-088 <br />Date: 1127/2000 County :Park Abbreviation :none <br />User: LDO Site :Antero G2vel Filename:-088-001 <br /> <br />Per mit or other job action :New application bond calculation <br /> <br /> Task description :Reduce hlghwalls two sides o(cell A <br /> <br />HOURLY E QUIPMENT COST Basic machine :Cal 08N (7996) Horsepower: 285 <br /> Blade type :Universal <br /> Anachment no. 1 : FOPS Cab Shin basis : 1 per day <br /> Attachment no. 2: NA <br /> Utilization % Cost data source: (CRG) <br /> Cost Breakdown : Ownership cosUhour : $35.37 NA <br /> Operating cosMour: $55.90 100 <br /> Ripper op. cosVhour: $0.00 NA <br /> Operator cosMour: $23.12 NA <br /> Total unit cosUhour: $114.39 Total lleet cost hour: $114.39 <br /> <br />MATERIAL <br />Initial QUANTITIES <br />Swell <br />Loose <br />volume: 20,961 BCY factor: 1.120 volume: 23,476 LCV <br />Source of Quantity Take-ofl :Exhibit E <br />Source of est. swell lactor : cal hndbk <br />Average push distance : 55 leer <br />Unatljusted hourly production : 1481 LCY/hr <br />Material consistenry descdption <br />Compacted till or em6ankmenl <br />Average push gradient : 20.00 % /negJ <br />Average site altitude : 9,000 feet <br />Matedal weight : 3.250 Ibs/LCY <br />Matedal weight descdption <br />Gravel - Pil7un <br /> <br />Operator skill : <br />0.75 Source <br />/avg.) <br />Matedal consistency: 0.90 (Cat H6 <br />Dozing methotl: 1.20 (slot) <br />Visibility: I.00 (avg.) <br />Job elticiency: O.B3 (7shiN/da <br />Spoil pile: 0.70 (Ind-ml, <br />Push gradient: 7.43 (Cal He <br />Altitude: 1.00 (Cal H6 <br />Material weight: 0.71 (Cal H6 <br />Blade type : 1.00 (6 or U, <br />Net correction : 0.47 <br />Adjusted unit protlucbon : 703.39 LCY/hr <br />Adjusted Ileel protluaion : 703.39 LCY/hr <br />JOB TIME AND COST <br />Fleet size : / Dozers) <br />Unit cost : $0.763 /LCV <br />Total (ob lime : 33.38 Hours <br />Total lob cost: $3,818 <br />