Laserfiche WebLink
<br /> <br />GOAL COI~/IFANY QUARTERLY POND INSPECTION REPORT <br />Inspector Name: LAR?y ~ <,r~/kf Date: 7-/9-92 <br /> <br />Pond Number: / O Date Last Inspection: q -if•9 2 <br />Site Name: CRD/~ ~t 2 Quarter: T~,~ad 92 <br /> <br />1. Design Depth Measured From Spillway Invert °l.o <br /> <br />2. Design Maximum Sediment Level Measured From Spillway Inv ert x,13 <br /> <br />3. Sediment Level/Pond Bottom Measured From Spillway Invert 7,8 <br /> <br />4. Water Level Measured From Spillway Invert ivoN~ <br /> <br />5. Discharge Through Spillway Since Last Inspection Yes _~ No <br />6. Rills and Gullies Yes k No <br />7. Vegetation Adequate ~ Yes _ No <br />8. Outlet Channel Erosion _ Yes _~ No <br />9. Animal Burrows Yes )`' No <br />10. Cracks Yes 1r No <br />11. Seepage _ Yes ~' No <br />12. Spillway Clogged _ Yes ~ No <br />13. Valves Operational X Yes _ No <br />ADDITIONAL COMMENTS: ~{~a.~e <br />MAINTENANCE REQUIRED: ~v~ Ne <br />--- - <br />------------- -- ---------- ----------gP/[[WAY~SNVEA <br />of ¢ ~ a ~ _ ~ O -~- <br />~O h a ~ ~qqy W O <br />3 v ~ W o os ~ h .W. R ~sl . <br /> <br />