Laserfiche WebLink
<br />COAL COMP,4NY QUARTERLY POND INSPECTION REPORT <br />Inspector Name: L,¢R/~.y Re~c~lke Date: 7.14.O-Z <br />Pond Number: q Date Last Inspection: 4 -/6 'g Z <br /> <br />Site Name: R S QDg Quarter: r~,~d 9 2 <br /> <br />1. Design Depth Measured From Spillway Invert 9. a <br /> <br />2. Design Maximum Sediment Level Measured From Spillway Inv ert q, 7 <br /> <br />3. Sediment Level/Pond Bottom Measured From Spillway Invert C.8 <br /> <br />4. Water Level Measured Fram Spillway Invert .ua~.t <br /> <br />5. Discharge Through Spillway Since Last Inspection Yes Y No <br />6. Ri 11 s and Gullies Yes k No <br />7. Vegetation Adequate ?'Yes _ No <br />8. Outlet Channel Erosion Yes X No <br />9. Animal Burrows Yes X No <br />10. Cracks Yes y No <br />11. Seepage _ Yes ~! No <br />12. Spillway Clogged _ Yes Y No <br />13. Valves Operational k Yes _ Pio <br />ADDITIONAL COMMENTS: ~ie.,iv <br />MAINTENANCE REQUIRED: ,ya./i <br />-- 4 <br />~~ o~ Q <br />3 <br />3 ~ <br />rY ~+g. <br />--- -- --sa/ccwar sNVERT _____ <br />n <br />~a~ Y ~~W 1 <br />s~ h " ~1 _ <br />