Laserfiche WebLink
Mr. Hal Simpson ~ • <br />July 25, 1994 <br />Page 5 <br />from the treatment plant, located five miles above the <br />confluence. Based on a transportation loss of 0.1$ per mile the <br />replacement of 2.02 acre feet annually will require release of <br />2.03 acre feet. The transportation loss is shown on the <br />accounting form. <br />A well permit application is being submitted concurrently with <br />this plan. A copy is enclosed. <br />If you have any questions please feel free to call. <br />Sincerely, <br />HATTON WATER CONSULTANTS, INC. <br /> <br />Tom Hatton <br />Principal Geologist <br />Enclosures <br />Figures <br />Tables <br />Effluent lease documentation <br />Ditch stock certificate <br />Accounting form <br />well permit application <br />Application fee <br />Airphoto <br />cc: Rob Laird <br />