My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE62908
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE62908
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:09:09 PM
Creation date
11/20/2007 7:46:26 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981014
IBM Index Class Name
Permit File
Doc Date
7/29/1981
Doc Name
REGULAR 112 PERMIT APPLICATION FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'i <br />lip,.-.~:__.~ ,.~P~'~j <br />EXHIBIT E <br />I,^~r~ 2 to iJ~i <br />RECLA1fATI0N PLAN M~~'~0 1_R,~C~ N~'r;l 4"",, _l~~ <br />x.010. OFp'. 0. .~.a~w ei hdSO'_'i CBS <br />Topsoil will be removed and stockpiled on the perimeters for <br />replacement in the reclamation phases. Backslepes and the pit floor ~ <br />will 'nave topsoil replaced at a depth of 9 to 18 inches with 12 inches <br />being t:ze average. Backslopes on the exterior perimeters will be fin- <br />ished at 3:1. The pit floor trill be left level with a oradual slope <br />towards the river. The terns of the lease specifically require this <br />as the Lessor wants to improve the site for livestock grazing. <br />Tlie pit floor is proposed to feather out on both sides of tl~e <br />river at elevation Soo"10 which will provide a minimum 100 feet setback <br />from the Slate River. This setback will Help insure the integrity of <br />the river. <br />The applicant is proposing that this pit be on a floating bond <br />with bonding on 20 acres. Of the 20 acres, 10 acres would be major <br />disturbance, 5 acres moderate disturbance and 5 acres minor disturb- <br />ance. Reclamation is proposed to start ,on Phase IA &B with replace- <br />ment of topsoil and reseeding in early 1984. Reclamation will then <br />follow extraction as rapidly 3s'possiBIe thereafter. <br />Bac}:slopes and the pit floor will be reseeded with the follow- <br />ing SCS recommended seed mix: <br /> Percent Lbs. PLS <br />Common Name Variety Composition per acre <br />Redtop 25% / .03 <br />Timothy Climax 25% / .37 <br />;fountain Brome Bromar '25% G. 25 <br />Orchardgrass 15~; .30 <br />Alsike Clover 10`/, .50 <br />' I <br /> <br />Total PLS per acre 7.45;1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.