Laserfiche WebLink
1 <br />' Bear Coal Company <br />stormwater Management Plan <br />' Page 4 <br />The outslopes of the ponds and topsoil pile are <br />vegetated. Vegetation reduces the amount of <br />' sediment that can be transported by stormwater from <br />the outslopes. <br />' g. Employee Education: There are no requirements for <br />spill response or material management practices. <br />The performance of preventive maintenance is the <br />function that employees will perform to implement <br />and maintain this SWMP. This work will be directed <br />by the Mine Manager so no employee education is <br />considered necessary. <br />' h. Testing for Non-stormwater: The potential <br />stormwater discharge points have been evaluated for <br />' the presence of non-stormwater discharges such as <br />mine drainage, contaminated springs, sanitary <br />waste, or process water of any kind. Non of the <br />preceding non-stormwater sources were identified. <br />The evaluation was performed by the undersigned. <br />The evaluation was based on a visual observation of <br />all of the stormwater discharge points shown on the <br />' enclosed map. The inspection occurred on March 4, <br />1993. <br />~~~ s 2E s <br />%J. E. Stover to <br />' 6. Comprehensive Inspection <br />One of the individuals identified in Sa above will inspect the <br />stormwater management controls at least twice each year in the <br />' spring and fall. The inspection will note if the haul road <br />ditch turnout and sediment structure requires maintenance. <br />The inspection will also note the condition of the pond and <br />' topsoil pile outslopes and note if rill repair or supplemental <br />seeding is required. <br />7. Record Keeping and Internal Reporting Procedures <br />' A written report or form will be kept at the mine site to <br />document the comprehensive inspections. The report will be <br />' reviewed with the Mine Manager, if maintenance is required, to <br />assure the maintenance is scheduled and performed. <br />' 8. Consistency with Other Plans <br />This SWMP is a stand alone document and does not depend on <br />other plans to be complete. A copy of this SWMP will be <br />' available at the mine office. <br />J~1 <br />A <br />