My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO27216
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO27216
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:46:34 PM
Creation date
11/20/2007 7:45:37 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981033
IBM Index Class Name
Hydrology
Doc Date
12/11/2001
Doc Name
1993 STORM WATER MANAGEMENT PLAN - BEAR MINES
Permit Index Doc Type
NPDES
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />' Bear Coal Company <br />stormwater Management Plan <br />' Page 4 <br />The outslopes of the ponds and topsoil pile are <br />vegetated. Vegetation reduces the amount of <br />' sediment that can be transported by stormwater from <br />the outslopes. <br />' g. Employee Education: There are no requirements for <br />spill response or material management practices. <br />The performance of preventive maintenance is the <br />function that employees will perform to implement <br />and maintain this SWMP. This work will be directed <br />by the Mine Manager so no employee education is <br />considered necessary. <br />' h. Testing for Non-stormwater: The potential <br />stormwater discharge points have been evaluated for <br />' the presence of non-stormwater discharges such as <br />mine drainage, contaminated springs, sanitary <br />waste, or process water of any kind. Non of the <br />preceding non-stormwater sources were identified. <br />The evaluation was performed by the undersigned. <br />The evaluation was based on a visual observation of <br />all of the stormwater discharge points shown on the <br />' enclosed map. The inspection occurred on March 4, <br />1993. <br />~~~ s 2E s <br />%J. E. Stover to <br />' 6. Comprehensive Inspection <br />One of the individuals identified in Sa above will inspect the <br />stormwater management controls at least twice each year in the <br />' spring and fall. The inspection will note if the haul road <br />ditch turnout and sediment structure requires maintenance. <br />The inspection will also note the condition of the pond and <br />' topsoil pile outslopes and note if rill repair or supplemental <br />seeding is required. <br />7. Record Keeping and Internal Reporting Procedures <br />' A written report or form will be kept at the mine site to <br />document the comprehensive inspections. The report will be <br />' reviewed with the Mine Manager, if maintenance is required, to <br />assure the maintenance is scheduled and performed. <br />' 8. Consistency with Other Plans <br />This SWMP is a stand alone document and does not depend on <br />other plans to be complete. A copy of this SWMP will be <br />' available at the mine office. <br />J~1 <br />A <br />
The URL can be used to link to this page
Your browser does not support the video tag.