Laserfiche WebLink
<br />(G) There are no drill or auger holes involved in this operation to be plugged to <br />prevent polluting drainage. Neither are there any adits or shafts to be closed or <br />reclaimed. <br />(7) Maximum slopes and combinations shall be compatible ~~ith the <br />configuration of surrounding conditions and selected land use. <br />Any backslopes will have a maximum slope of 3H:1V or flatter, which will be <br />compatible with surrounding conditions and land use. No swinmting or pond will <br />be involved after reclamation. <br />(8) If the operator's choice of reclamation is for agricultural or horticultural <br />crops which normally require the use of farm machinct~~, the operator shall <br />grade so that the area can be traversed with farm macbinet~~. <br />The reclaimed area, with a maximum of 3H:1V backslope will be able to be <br />traversed by farm machinery, but this is not essential to the final use. <br />(9) An operator may bacl:fill structural fill material generated within the <br />permitted area into an excavated pit within the permit area ..................... <br />No structural backfill material will be generated so there will be none to affect <br />reclamation. <br />(10) All mined materials to Uc disposed of within the affected area must be <br />handled in such manner so as to prevent any miauthm•ized release of pollutants <br />to the surface drainage system. <br />The mined materials consist solely of sand and gravel, which are basically <br />chemically inert and will not release any pollutants to the surface drainage system. <br />(11) No unauthorized release of pollutants to gtoundwatcr shall occur from <br />any materials, mined, handled or disposed of within the permit area. <br />There will be no pollutant-bearing material that will be handled, mined or <br />disposed of in the permit area [hat could be released to groundwater. <br />3.1.G -General Requirements <br />None of the items mentioned apply to this project. <br />3.1.7 Groundwater -Specific Requirements <br />This operation will have no affect on groundwater or bring any other water permit <br />requirements into play. <br />