Laserfiche WebLink
PART I <br />Page 8 <br />Permit No. CO-0044776 <br />A. DEFINTIION OF EFFLUENT LIMITATIONS • <br />6. Whole Effluent Toxicity Testing Requirements (Acute) - OutfaLl 002 (continued) <br />ii. The PTI/TIE results indicate that the toxicant(s) represent pollutant(s) tha[ may be controlled with specific <br />numerical limits, and the Division agrees that the numerical controls are [he most appropriate course of <br />action. <br />iii. The PTI/TIE reveals other unique conditions or characteristics which, in the opinion of the Division, justify <br />the incorporation of unanticipated special conditions in the permit. <br />B. MOMTORING REQUIREMENTS <br />1. Frequency and Sample Tvne <br />In order to obtain an indication of the probable compliance or noncompliance with the effluent limitations specified <br />in Part I.A.1, the permittee shall monitor all effluent parameters at the following frequencies. Such monitoring will <br />begin immediately and last for the life of the permit unless otherwise noted. The results of such monitoring shall be <br />reported on the Discharge Monitoring Reports (DMR) (see Part I.E.1. for routine reporting requirements). Also see <br />Pan I.B.2. for additional monitoring requirements. <br />a. Outfalls OOl and 003 <br />Effluent Parameter Measurement Freq encv Sample Tyue <br />Flow, MGD Weekly Instantaneous <br />or Continuous <br />Total Suspended Solids, mglt! Mont}tly Grab <br />Total Iron, mg/Q Monthly Grab <br />Settleable Solids, mP/P Mont}ily Grab <br />Oil and Grease, mg/Q Weekly Visual <br />pH, s.u. Weekly In-sim <br />b. Qsitfa11002 <br />Effluent Parameter Measurement Frequencv Sample Tyne <br />Flow, MGD Weekly Instantaneous <br /> or Continuous <br />Total Suspended Solids, mg/Q Monthly Grab <br />Total Iron, mg/Q Monttily Grab <br />Settleable Solids, mQ/Q Monthly Grab <br />Oi] and Grease, mg/P Weekly Visual <br />pH, s.u. Weekly In-situ <br />Whole Effluent Tonicity, Acute Quarterly Grab <br />c. Oil and Grease Moni[orine <br />For every outfall with oil and grease monitoring, in the event an oil sheen or floa[ing oil is observed, a grab <br />sample shall be collected, analyzed, and reported on the appropriate DMR. [n addition, corrective action shall <br />be taken immediately to mitigate the discharge of oil and grease. A descrip[ion of the corrective action taken • <br />should be included with the DMR. <br />Self-monitoring sampling by [he petmittee for compliance with the monitoring requirements specified above shall be <br />performed at the following locations: outfalls 001. 002 and 003 -- al( after final treatment and prior to entering Deer <br />Trail Ditch. ~ .., .. <br />See Part I,C. for Defu>itions. Amendment No. 1 Issued '~~ Effective <br />