My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE62794
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE62794
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:09:04 PM
Creation date
11/20/2007 7:42:41 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2005080
IBM Index Class Name
Permit File
Doc Date
6/2/2006
Doc Name
Rationale for Recommendation for Approval Over Objections
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Readhill Forest POMWACA <br />P.O. Box 1233 <br />Buena Vista, CO 81211 <br />Fred H. Wisely 23-Mazch-06 23-March-06 <br />4235 Bromley Place <br />Colorado Springs, CO 80906 <br />Robert L. White 23-March-06 23-March-06 <br />2013 Fox Ridge Drive <br />Blue Springs, MO 64015 <br />Kent Rolf 23-March-06 23-Mazch-06 <br />P.O. Box 43 <br />Fairplay, CO 80440 <br />II. ISSUES RAISED BY OBJECTING PARTIES DURING THE INITIAL COMMENT <br />PERIOD: <br />Issues raised by objecting parties are listed below, along with the names of the objectors. The Division's <br />response to obj ection issues follows. Issues are listed under the section ofthe Construction Materials Rules <br />and Regulations to which they pertain. Issues that the Division believes are not within the jurisdiction of <br />the Division or Board aze listed afterwazds. <br />A. ISSUES WITHIN THE JURISDICTION OF THE DIVISION AND BOARD <br />1. Rule 4.2.1(1) Adequacy of Financial Warranties <br />• Fred Wisely raised the concern that the site be adequately bonded for reclamation of the site <br />and for potential damages resulting from activity at the site. <br />Division of Minerals and Geology (DMG) Response <br />The question raised by the above comments is related to Rule 4.2 of the Construction Materials <br />Rules and Regulations, which requires that all Financial Warranties shall be set and maintained at a <br />level which reflects the actual current cost of fulfilling the requirement of the Reclamation Plan. <br />The Rules further state that the Board or Office shall prescribe the amount and duration of Financial <br />Warranties, taking into account the nature, extent, and duration of the proposed mining operation, <br />the magnitude, type and estimated cost of planned reclamation, and the requirements of the Act. <br />And, the Financial Warranty amount shall include an amount equal to five (5%) percent of the <br />amount of the cost of reclamation to defray the administrative costs incurred by the Office in <br />conducting the reclamation. <br />
The URL can be used to link to this page
Your browser does not support the video tag.