My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO27189
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO27189
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:46:33 PM
Creation date
11/20/2007 7:41:00 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981039
IBM Index Class Name
Hydrology
Doc Date
8/10/1981
Doc Name
AUTHORIZATION TO DISCHARGE UNDER THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
Permit Index Doc Type
NPDES
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • PART III <br />Page 17 of 19 <br />Permit No: CO-0035653 <br />B. GENERAL REQUIREMENTS <br />The permittee shall not discharge after the expiration date of this <br />permit without authorization. In order to receive authorization to <br />discharge after the expiration date, the permittee shall, no later <br />than 180 days prior to the expiration date of this permit, submit a <br />new NPDES application and fees as required by [he permit issuing <br />authority. <br />2. The permittee is required to submit an annual fee as set forth in <br />Section 25-8-502 C.R.S. 1973 as amended. Failure to submit the <br />required fee is a violation of this permit and will result in the <br />suspension of said permit and enforcement action pursuant [o Section <br />25-8-601 et. seq., 1973 as amended. <br />3. Within sixty (60) days of the effective date of this permit, the <br />permittee shall file a statement with the Environmental Protection <br />Agency and the State Water Quality Control Division which shall <br />contain the names of the person or persons who are designated to <br />report conditions as noted in "Noncompliance", Part II, Section A, <br />Paragraph 2, and as referenced in "Oil and Hazardous Substance <br />Liability", PART II, Section B, Paragraph 8. The permittee shall <br />continually update this list as changes occur at the facility. <br />4. Within three (3) months after the effective date of this permit, a <br />flow-measuring device shall be installed at all discharge points. <br />At the request of the Regional Administrator of the Environmental <br />Protection Agency or the Director of the State Water Quality Control <br />Division, the permittee must be able to show proof of the accuracy <br />of any flow-measuring device used in obtaining data submitted in <br />the monitoring report. The flow-measuring device must indicate <br />values within ten (10) percent of the actual flow being discharged <br />from the facility. <br />5• Discharge points shall be so designed or modified that a sample of <br />the effluent can be obtained at a point after the final treatment <br />_ process and prior to discharge to state waters. <br />a! <br />3/81 <br />
The URL can be used to link to this page
Your browser does not support the video tag.