Laserfiche WebLink
Exhibit 13-11.7a, Coal Carrier Access Road, presents a plan view and cross-section of the road as it <br />exists. • <br />SCC is requesting approval for retention of these access roads as postmining structures. Copies of the <br />written requests from the landowners are presented in TAB 3, Adjudication File, Appendix 3-7, <br />Landowner Requests for Permanent Roads. <br />These roads will increase the utilization of the reclaimed and surrounding areas. When a access road is <br />no longer needed for operations, Peabody proposes the following: <br />a. The top road surface will be narrowed to 20 feet <br />b. The road surfacing material from the narrowing of the section will be placed on the remaining <br />road width <br />c. Slopes flatter than 3H:1 V will be retopsoiled <br />d. .All areas redisturbed by road narrowing activities will be reseeded to the edge of road surface. <br />• <br />• <br />TR-50 28a Revised 11/04 <br />