Monitoring results were submitted to CDMG on January 6, 1994 in MR No. 29. The monuments were <br />surveyed on six different occasions between 6/13/92 and 10/8/93. No appreciable movement was • <br />detected. <br />At the request of CDMG, the monitoring pins were surveyed in June 1994. No appreciable movement <br />was detected; therefore, monitoring was suspended. Final monitoring results were submitted to CDMG <br />on July 21, 1994 in MR No. 31. Monitoring pins will remain in place for future reference. <br />Maintenance. Haul roads are inspected on a daily work basis. If, upon inspection, it is determined that <br />repairs are needed, appropriate repairs such as, but not limited to, blading, filling of potholes, <br />replacement of the road surfaces, revegetation of side slopes and watering for dust control, will be <br />conducted as necessary. <br />Retention. SCC proposes to leave some of the existing haul roads as permanent access roads in the <br />permit area (approximately 6.7 milesl~ The proposed permanent sections of haul roads (shown on <br />Exhibits 20-2 and 20-2A1 include: <br />• Haul Road G -begins at County Road 53 and proceeds southeast to the beginning of Ridgeline <br />access road. 11.5 mi.l <br />• Mine Entrance Haul Road -begins at County Road 53 and proceeds generally southeast to the <br />beginning of Haul Road A. 11.6 mi.) • <br />• Haul Road A -begins at the south end of the Mine Entrance Haul Road and proceeds generally <br />to the southeast to the west end of Haul Road H. 11.5 mi.) <br />• Haul Road J -intersects with the Ridgeline Access Road and proceeds southward to join with <br />Haul Road K via a short section of a connector access road. 11.5 mi.) <br />• Haul Road K -continues southward from the connector access road (0.6 mi.l <br />SCC is requesting approval for retention of these haul roads as postmining structures. Copies of the <br />written requests from the landowners are presented in TAB 3, Adjudication File, Appendix 3-7, <br />Landowner Requests for Permanent Roads. <br />These roads will increase the utilization of the reclaimed and surrounding areas. When a haul road is no <br />longer needed for operations, Peabody proposes the following: <br />a. The top road surface will be narrowed to 20 teet <br />b. The road surfacing material from the narrowing of the section will be placed on the remaining <br />road width <br />c. Slopes flatter than 3H:1V will be retopsoiled <br />d. All areas redisturbed by road narrowing activities will be reseeded to the edge of road surface. <br />• <br />TR-50 27a Revised 71104 <br />