<br /> <br />ERkIBIT E <br />Reclamation Plan <br />The area that is affected at the present time has 4 <br />stockpiles of usable gravel. The remaining mined area <br />will be used for future stock piles. Two of these•.piles <br />will be eliminated around April, but the area x1.11 be . <br />needed for the other piles so I see no reclamation to <br />take place for approximently 2 years. <br />We will continue to stock pile the top soil to- <br />rrazds the nest end of the mine where xe have 2 piles <br />already. The top soil is removed by scrappers or our <br />D-8 Cat and hauled to the existing piles or pilaf in:a <br />nex pile. Looking on the mining timetable, you see 'that <br />we mined right dorm the middle. We are staffing to mine <br />in the phase one block at the present time. lfhen xe have <br />the phase one and txo complete and most of the stock piles <br />are removed we will reclaim +,hese areas before entering <br />+,he phase three area. So everything west o£ phase 3 & 4 <br />*rill be reclaimed in an orderly fashion before t~r <br />mined and will continue in a zest to eas pattein. , <br />First, our scrappers x111 bring in a fill material to <br />fill in the holes and graduate out the steep slopes of 1~ <br />/~" <br />the mining perimeter to be not greater than 1-3. We ~ <br />~ <br />then will place 6-12" of t~*~so11 _over the relamed area <br /> <br />which will betaken from the stocY,pile and some from the ~~I~ <br />phase three area which we x111 begetting ready for mining V\ <br /> l <br />bar our sc?apiwrs. Since we've also been in the farming ~ <br />business for 20 years, we will be very careflall with the <br />placing of topsoil so there will be very little, if any <br />condi+,ions for soil erosion. When this is done, the seed <br />bed will be prepared by pulling a 20' off set disc over <br />