Laserfiche WebLink
<br />Table L-3 GCC Rio Grande Portland Cement Reclamation Cost Estimate Scraper Team Work <br />SCRAPER TEAM WORK <br />Description Acres Topsoil Thickness Loose Volume Unit Cost Total Cost Reference <br /> ac ft (LCY $/LCY) $ <br />Replace topsoil on Conveyer Corridor 17.5 1 28,233 $ 0.63 $ 17,787.00 CIRCES (dmg) <br />Replace topsoil on Final Pit 19 1 30,653 $ 0.63 $ 19,311.60 CIRCES (dmg) <br />Replace topsoil on Plant Site 69 1 111,320 $ 0.63 $ 70,131.60 CIRCES (dmg) <br />Replace topsoil on Railroad 39 1 62,920 $ 0.63 $ 39,639.60 CIRCES {dmg) <br />Arroyo Restoration 883710 $ 0.63 $ 556,737.30 CIRCES (dmg) <br />Arroyo Topsoil 27 1 43,560 $ 0.63 $ 27,442.80 CIRCES (dmg) <br />~ $ 731,049.901 <br />L-~ 7-08-02 <br />