Laserfiche WebLink
• <br />Table L-1 GCC Rio Grande Portland Cement Quantity Takeoff and Draft Cost Summary <br />DESCRIPTION MATERIAL DIMENSIONS (Ft) QUANTITY UNIT $IUNIT COST <br />(RAILROAD SPUR', __ ~ <br />~ --_ <br />Railroad Corridor Steel Track 20,000.00 LF $6.11 $122,200 ~~ <br /> Ballast 1 CY per LF+C7 20,000.00 LF $2.68 $53,600 ~ ~~ <br />Revegetation-25% Failure Rate Grading/spread topsoil 9260x200x1 _ 62,920.00 LCY $ 0.63 $39,640 <br /> Fertilize,Seed, Mulch 9260x200 ~ ~ 2 5 39.00 - ACRE $ 512.72 $24,995 <br /> RAILROAD SPUR SUBTOTAL iiL. q/ $240,435 <br />ARROYO RESTOR_ATION,^ yy <br />Scraper fill work Grading <br />Revegetation-25% Failure Rale Spread topsoil <br />Fertilize,Seed, Mulch <br />RED~ROCK QUARRY Final _Pit ~;.°;s~] <br />Bulldozer work Grading <br />Revegetation-25% Failure Rate Grading/spread topsoil <br />Fertilize,Seed, Mulch <br />883,710.00 LCY $ 0.63 $556,737 <br />43,560.00 LCY $ 0.63 $27,443 <br />27 - = ACRE $ 512.72 $17,304 <br />ARROYO SUBTOTAL $607,484 <br />((2600x10.1)+(900x12.2)+(2200x12.2)+(1500x11 35,985,78 LCY $ 0.43 $15,474 <br />9260x200x1 30,653,33 LCY $ 0.63 $19,312 <br />9260x200 19 ~ " ACRE $ 512.72 $12,177 <br />CONVEYOR CRUSHER AND CORRIDOR SUBT OTAL $46,963 <br /> <br />CONVEYOR CRU,SHER~AND CORRIDORr_,.~ <br />- <br />/ <br />Crusher <br />Steel Frame 12' x 40' x 40' 40 LF $12.26 $490 / <br />Conveyors <br />1 Steel Frame 1000' x 6' x 8' 1,000.00 LF $12.26 $12,260 <br />2 Steel Frame 675' x 6' x 8' 675.00 LF $12.26 $8,276 <br />3 Steel Frame 300' x 6' x 8' 300.00 LF $12.26 $3,878 <br />4 Steel Frame 300' x 6' x 8' 300.00 LF $12.26 $3,678 Z`6,Y$z <br />Revegetation-25%Failure Rate GradinglBackfill 660,555.56 LCY $ 0.43 $284,039 <br />Spread topsoil 28,233.33 LCY $ 0.63 $17,787 <br />Fertilize,Seed, Mulch 19 Acres 17.5 ACRE $ 512.72 $11,216 = , <br /> RED ROCK QUARRY SUBTOTAL $341,424 <br />TOTAL ESTIMAT"E-direct costs..-~1 <br />Y_.~~ _. _ _.-_y- __ v <br />$4,061,897 <br />ABBREVIATIONS <br />CF Cubic Feet LCY Loose Cubic Yard <br />SF Square Feet CY Cubic Yard <br />LF Linear Feet SY Square Yard <br />L-5 7-OS-02 <br />