My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE62606
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE62606
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:08:56 PM
Creation date
11/20/2007 7:38:17 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2002004
IBM Index Class Name
Permit File
Doc Date
7/10/2002
Doc Name
Bond Recalculation
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Table L-6 GCC Rio Grande Portland Cement Reclamation Cost Estimate <br />BULDOZER WORK <br />Loose Volume Unit Cost Total Cost MEANS Reference <br />(LCY) ($/LCY) ($) <br />696,541 $ 0.43 $ 299,513 23151205020 <br />SCRAPER TEAM WORK <br />Loose Volume Unit Cost Tolal Cost Reference <br />(LCY) ($/LCY ($ <br />1,160,397 $ 0.63 $ 731,050 CIRCES (dmg) <br />• <br />DEMOLITION WORK <br />Descri lion Quantity Unit Unit Cost Total Cost MEANS Reference <br />Plant Superstructure Demolition 11,236,087 CF 0 1,449,455 22001000012 <br />Plant Superstructure Disposal 1,123,609 CF 0 226,969 23154001200 <br /> 23202000040 <br />Concrete Floors and Foundations 154,917 SF 3 410,221 22208755100 <br />Asphalt Paving 93,852 SF 5 441,104 22208751750 <br />Crusher and Conveyors 2,315 LF 12 25,382 <br />Rail 20,000 LF 6 122,200 22008753500 <br />Ballast 20,000 LF 3 53,600 22008753600 <br />Foundations-Footings 14,553 LF 12 172,166 <br />Concrete Disposal 154,917 CF 0 31,293 <br />Total Demolition Costs $ 2,935,391 <br />TOTAL DIRECT COSTS <br />Descripition Totals <br />Revegetation 103,505 <br />Grade Slope 299,513 <br />Replace Subsoil and Topsoil 731,050 <br />Demolition of Plant Site 2,935,391 <br />Total Direct Costs 4,069,459 <br />TOTAL INDIRECT COSTS <br />Description Unit Unit Totals <br />Liability Insurance % of Direct 1.55% $ 63,077 <br />Performance Bond % of Direct 1.05% $ 42,729 <br />Job Superintendent Hours $ 54,018.75 $ 54,019 <br />Profit %ofDirect 10.00% $ 406,946 <br /> Total O & P $ 566,771 <br />I Contract Amount $ 4,636,230 I <br />• <br />Reclamation Management and/or Administration I % of Contract I 5.00% I $ 231 <br />L-10 7-08-02 <br />
The URL can be used to link to this page
Your browser does not support the video tag.