Laserfiche WebLink
<br />Table L-5 GCC Rio Grande Portland Cement Estimated Demolition Work <br />DEMOLITION WORK <br />Description Quantity Unit Unit Cost Total Cost MEANS Reference <br />Plant Suberstructure 11,236,087 CF $ 0.129 $ 1,449,455 22001000012 <br />Plant Superstructure Disposal-non Steel Materials 1,123,609 CF $ 0.202 $ 226,969 23154001200 <br />10% of Total Volume(onsite-truck and loader) 23202000040 <br />Concrete Floors and Foundations 154,917 SF $ 2.648 $ 410,221 22208755100 <br />Asphalt Paving 93,852 SF $ 4.700 $ 441,104 22208751750 <br />Crusher and Conveyors 2,315 LF $ 12.260 $ 28,382 <br />Rail 20,000 LF $ 6.110 $ 122,200 22008753500 <br />Ballast 20,000 LF $ 2.680 $ 53,600 22008753600 <br />Foundations-Footings 14,553 LF $ 11.830 $ 172,166 22205501120 <br />Concrete Disposal (onsite-truck and loader) 154,917 CF $ 0.202 $ 31,293 23154001200 <br /> 23202000040 <br />~ Iota1 Demolition Cost b 2,935,391 ~ <br />Note 1: All materials associated with equipment (ie conveyors) will be dismanteled and sold <br />Note 2: All steel beams, girders, joist, etc. will be sold as salvage <br /> <br />L-9 7-08-02 <br />