My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE62477
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE62477
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:08:51 PM
Creation date
11/20/2007 7:34:54 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1997014
IBM Index Class Name
Permit File
Doc Date
6/16/1997
Doc Name
FAX COVER
From
DMG
To
KJ HAMMER CO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br />. , <br />~j <br />DIVISION OF MINERALS AND GEOLOGY <br />Depanmcnl of Natural Resources <br />I l I .i Shaman A .Room 215 <br />Denvcr. ColoraAo 80203 <br />Phone: 13031 861.- 7 567 <br />FA%~ U031 832-7f I OG <br />April 28, 1997 <br />Mr. John Hickman <br />Western Mobile <br />1590 W. 12th Ave. <br />Denver, CO 80204 <br />Re: Technical Revision TR-003, Deer Creek Quarry <br />Permit No. M-79-214 HR <br />Dear Mr. Hickman: <br />~. <br />DEPARTMENT OF <br />NATURAL. <br />RESOLJIZCE~'.' <br />Roy Romer <br />Governor <br />tames 5. LiKhhean <br />Executive Uvecbr <br />M¢haa•I B Long <br />D ivis~on Ducaio~ <br />The Division received a FAX from Tuttle Applegate today with the <br />operator's responses to the Division's inspection report of April <br />25, 1997. The response consists of a cover letter and a new SEDCAD <br />run for the Deer Creek Quarry sediment control plan. There are <br />four responses and commitments included in the cover letter. <br />The commitment to re-route the riprap channel between ponds UB1 to <br />UB2 is acceptable to the Division. The commitment to buttress the <br />southeast end of the entrance sediment pond with coarse material is <br />also acceptable. This needs to be completed so that the outer <br />slope of the pond is free draining. <br />The Division has reviewed and approved the new SEDCAD run for the <br />site and re-design of pond MB1. You are authorized to re-construct <br />pond MB1 to the new design criteria. <br />The Division will need to be notified which type of structure you <br />will be installing at the entrance gate (see the inspection report <br />of April 25, 1997). If you intend to install a trench at that <br />location, we will need to be informed of its width and depth. <br />At the conclusion of the installation of the runoff structures, <br />there are two written certifications which must be received prior <br />to the Division's final acceptance of the stone water routing plan. <br />These are summarized in items 1 and 2 on page 1 of Allen Sorenson's <br />memo of February 19, 1997 regarding quarry drainage at the Deer <br />Creek Quarry. Item no. 1 requires that a written certification <br />stating that the riprap was adequately sized needs to be prepared <br />by a qualified professional and provided to the Division at the <br /> <br />STATE OF COLORADO <br />
The URL can be used to link to this page
Your browser does not support the video tag.