Laserfiche WebLink
-2- <br />2. Approxi:~ately,itwelve inches (12") of suitable road base material <br />• will be spr^_ad onto the roads and location of the explosive <br />storage bunkers and trailers. <br />3. Currently, the explosives structures are permitted with the <br />Colorado Division of Mines and the Federal Bureau of Alcohol, <br />Tobacco and Firearms. <br />The surface facilities for the Explosives Storage Area will be . <br />built in 1984 and the trailers, bu::kers and storae bins moved in <br />1985. Prior to moving the facilities in 1985 all applicable <br />State and Federal explosives permits will be modified and <br />approved to reflect the relocation. <br />lamation Plan <br />It is anticipated that the life of the Explosives Storage Area <br />will be concurrent with the life of the Colowyo Mine. Reclamation of the <br />Explosives Storage facility will take place concurrent with the remainder <br />of the mine and associated facilities. Final reclamation will proceed in <br />accordance with the approved plans addressed in Rule 2.05 Operations and <br />Reclamation Plans and Rule 4 Performance Standards in the Colowyo Permit <br />Application <br />Bonding <br />• Construction of the Explosive Storage Area will result in an <br />additional disturbance of approximately nine (9) acres. The disturbance <br />will be located outside of tY.e present bonded area as shown on Map 34 Bond <br />Calculation Man, Central <br />Colowyo's current bond provides a contingency for 3.67 acres of <br />disturbance for an Explosives Storage Area. The proposed Explosives <br />Storage Area is approximately 5.33 acres in excess of that contingency. <br />The bonding calculations detailed below indicate that the additional <br />disturbance could be reclaimed for $7,961.58. <br />Utilizing the bonding cost factors and production factors that <br />were submitted to the Division on July 26, 1982, the projected bonding <br />calculations would be as follows: <br />1. Explosives Storage Area Reclamation <br />A. Rip Area <br />5.33 acres x 2'dp x 43,560 ft2 x cy = 17,198cy <br />Acre x 27 ft <br />17,198cy/1~,346bcy/hr = 12.8 hr x $128.44/hr = 51,644.03 <br />• <br />