My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE62297
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE62297
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:08:44 PM
Creation date
11/20/2007 7:30:03 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982057
IBM Index Class Name
Permit File
Doc Date
5/1/2003
Doc Name
1991 Hydrologic Monitoring Program & Current Hydrologic Monitoring Program
Section_Exhibit Name
Tab 15 Appendix 15-3 & Appendix 15-3a
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE 1 <br />CURRENT HYDROLOGIC MONITORING PROGRAM, SENECA II-W <br />Surface Water <br />Monitoring Frequency <br />Site Number Discharge Water Quality Comments <br />SW-S2W-SG5 Monthly Monthly/Triannual <br />SW-S2W-SG7 Monthly Monthly/Triannual <br />SW-S2W-SG9 June/September June/September <br />SW-S2W-FG1 Continuous Monthly/Triannual <br />SW-S2W-FG4 Continuous Monthly/Triannual <br />SW-S2W-SG17 June/September June/September Will discontinue upon <br /> construction of Pond 017 <br />NPDES 005 Continuous Monthly/Triannual Monitor per NPDES permit <br />NPDES 006 Continuous Monthly /Triannual Monitor per NPDES permit <br />NPDES 009 Continuous Monthly /Triannual Monitor per NPDES permit <br />NPDES 015 Continuous Monthly /Triannual Monitor per NPDES permit <br />NPDES 016 Continuous Monthly /Triannual Monitor per NPDES permit <br />NPDES 017 Continuous Monthly /Triannual Monitor per NPDES permit <br />Monthly =March-October only, at sites with a SW prefix monthly water quality consists of field <br />parameters only (pH, temperature, electrical conductivityl. Monthly monitoring at NPDES sites <br />will be conducted during all months. <br />Triannual =Water quality samples lanalyzed according to the surface water parameter long <br />list) are collected during the key hydrologic events of spring snowmelt, late spring-early summer <br />baseflow, and fall baseflow. <br />Continuous =Continuous flow monitoring except during the winter months when the stilling <br />wells and flumes are frozen. <br />NOTE: For all springs (nativel, spoil springs, and stream sites, when sampling for the <br />surface water parameter long list is required and flow is less than 5 gpm, only field parameters <br />will be measured. <br />153a-3 Revised 01102 <br />
The URL can be used to link to this page
Your browser does not support the video tag.