My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE62285
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE62285
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:08:42 PM
Creation date
11/20/2007 7:29:52 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2000041
IBM Index Class Name
Permit File
Doc Date
3/13/2000
Section_Exhibit Name
Application
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />(iii) Outline the sequence in which each stage of the operation will be carried out: <br />This will not be a phased or staged operation, but will be an ongoing floating bond type operation. <br />Mining will start on the west side, with a series of three 5-acre cells running south to north. When <br />these are mined out, mining will then move immediately to the next series of adjacent 5-acre cells, <br />and then continue in the same manner until they are mined out, and then will proceed south in the <br />same manner. <br />(F) A map in Exhibit "C" may be used, along with the narrative to present the following <br />information: <br />(i) Nature, depth and thickness of the deposit to be mined and thickness and type of <br />overburden. <br />Core drilling reports show that overburden ranges from 5' on the south to a range of 8' [0 10', with <br />one hole of 12' on the north. The aggregate deposit ranges consistently from 20' - 25'. <br />(ii) Nature of the stratum immediately beneath the material to be mined in sedimentary <br />deposits. <br />Core drill reports from the commercial lab that did the testing state that the stratum immediately <br />beneath the material to be mined is Pierre Shale. <br />(G) Identify the primary and secondary commodities to be mined and describe the intended <br />use: <br />The primary commodity to be mined is sand and gravel construction aggregates. It will be used for, <br />among other things, concrete aggregates, road material -asphalt and base course, specification and <br />non-specification fill material, leach rock, decorative rock and other assorted construction uses. At <br />the present time there are no known secondary products available to be mined or produced. <br />(H) Name and describe the intended use of all incidental products to be produced: <br />No incidental products will be involved or produced with this operation. <br />D-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.