My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE62202
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE62202
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:08:39 PM
Creation date
11/20/2007 7:27:45 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983035
IBM Index Class Name
Permit File
Doc Date
3/21/1983
Doc Name
TERRA CONSTRUCTION INC VOLLMER PIT FN 83-35
From
MLRD
To
RINDAHL & ASSOCIATES
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.~ -- ~ O <br />P1r. Gilbert F. Rindahl -5- r~larch 21, 1983 <br />Exhibit J <br />,~ This exhibit has statements strongly reconimeriding that the riparian zone <br />~ .not be disturbed and that drainage into this zone must be controlled. As <br />mentioned above, this is important and has not been adequately covered <br />(especially as concerns sediment control). <br />1. As mentioned above., the cateyories of disturbance (major, moderate, <br />and minor) and the acreages comprising each have not ueen adequately <br />outlined. This makes analysis of the costs given difficult. It <br />appears tlrat• the costs only contemplate lU acres of total disturbance <br />at any one time. This appears to be much too low a figure. Please <br />clarify this matter. <br />2. Amore detailed cost break-down 51}uuld be given for all the necessary <br />reclamation activities, given any new activities to be undertaken as <br />a result of the response to this letter. Ihis cost break-down <br />should be more closely tied to a cost per acre or cast per activity <br />basis than it is now. Also, some of the costs given now seem low. <br />For example, seeding, mulching and crimpiny is given at $30.00 per <br />acre. The total cost indicates, however, that you meant $30U.UU per <br />acre. Even this figure seems low given present costs. This should <br />be broken down further, including such items as raking to cover seed <br />or drilling. <br />Exhibit fit <br />r/ To date, our Division has received no proof of operator compliance with <br />El Paso Uounty zoning. Please provide this or have the county provide it. <br />Exhibit N <br />Exhibit L <br />Will the operator require a fugitive dust permit for this operation? If <br />so, proof of the permit (or application for it) should be provided to the <br />Division. <br />"\ s D <br />\~ <br />As you know, the Division must be provided with proofs of the four <br />sequential weeks of publication and notifications to all adjacent <br />landowners. This must be done before the Board can consider this <br />application during the scheduled April 27-28, 1983 meeting. <br />As always, if you have any questions concerning any parts of this letter, <br />please call me. <br />Sincerely, <br />'1~1r~ l" <br />Mark S. Loge <br />Senior Reclamation Specialist <br />MSL/eap <br />por. No. 1759 <br />
The URL can be used to link to this page
Your browser does not support the video tag.