Laserfiche WebLink
<br />STATE OF COLORADO <br />OFFICE OF THE STATE ENGINEER - <br />Division of Water Resources <br />Department o(Nawral Resources <br />1313 Sherman Scree[, Room 818 <br />Denver, Colorado 80203 <br />Phone !3031 866.3581 <br />fA%(3031866-3589 / <br />www.waterstate.co.us <br />Response to Reclamation Permit Application Consideration <br />DATE: Y/July 28, 2005 <br />TO: J Kate Pickford, Environmental Protection Specialist <br />CC: Division 7 Office• Distri 't 30 Water Commissioner <br />FROM: Don West, P.E. <br />RE: Rock Dog #1 Pit, File No. M-2005-045 <br />Operator: Gravel, LLC <br />Contact: Matt Carnahan 970/259-4658 <br />Section 30, Twp 34N, Rng SW, NM P.M., La Plata County <br />~~oF ~~ <br />« ~ <br />a lets s <br />am oven: <br />Governor <br />Russel! George <br />Executive DireCOr <br />Mal D. Simpsa+, P.E. <br />State Engineer <br />CONDITIONS FOR APPROVAL <br />^ The proposed operation does not anticipate exposing groundwater. Therefore, exposure of ground <br />water must not occur during or after mining operations. If stormwater is contained on-site, it must <br />infiltrate into the Bound or be released to the nattual stream system within 72 hours, or all work <br />must cease until a substitute water supply plan, or augmentation plan approved by water court, is <br />obtained. Reclamation plans must ensure water will not be retained onsite for more than 72 hours <br />unless an augmentation plan approved by water court is obtained. <br />® The proposed operation will consume ground water by: ®evaporation, ^ dust control, <br />® reclamation, ®water removed in the mined product, ®processing, ^ other:. <br />Prior to initiation of these uses of ground water, the applicant will need to obtain either a gravel pit <br />or other type of well permit, as applicable. Water is available for appropriation at this location. <br />^ Prior to approving a well permit, the applicant must conduct a field inspection of the site and <br />document the locations of all wells within 600 feet of the permit area. The applicant must then <br />obtain a waiver of objection from all well owners with wells within 600 feet of the permit area or <br />request a hearing before the State Engineer. <br />^ Other: <br />COMMENTS: <br />