Laserfiche WebLink
C~ <br />P1 r. Carl Winsor <br />-2- <br />C~ <br />ust 10, 1984 <br />Exhibit E - I presume you plan to grade the back slopes of this pi{ to a <br />~J maximum of 3:1 in final reclamation. Please clarify this matter. <br />~r Exhibit F - Is the special use permit also applicable to the porti~n of the <br />v pit in adjacent Section 13? <br />Bond Pit <br />Exhibit A - It appears that tF~e whole southern portion of the perm t also lies <br />in the SEl/4 SE1/4, Section 7. This area should also be reference in the <br />legal description. <br />Exhibit F - Is the special use permit also applicable to the portion of the <br />pit in the adjoining SEl/4 SE1l4 of Section 7? <br />Brann Pit <br />Application Item 15 - 'Would not the proposed future land use be be ter <br />described as rangeland and road? <br />Exhibit E - I suggest that some special commitment to erosion cont of during <br />reclamation be made for the 2:1 slopes east of the road. Cross sl pe <br />contouring and/or netting (anchored) are two suggestions in this r gard. <br />Ditsnn Pit <br />Exhibit A - As the pit is developed to the east, the SEl/4 NWl/4 o Section 9 <br />will also be involved in the permit area. This area should also b referenced <br />in the legal description. <br />Exhibit F - Is the special use permit also applicable to the porti n of the <br />permit area in the SEl/4 NWl/4 of Section 9? <br />Idler Pit <br />Exhibit A - An examination of the map seems to indicate that the t al <br />disturbed area will extend into the N1/2 NW1.4 of Section 34, is well as the <br />quarter quarter Sections given. Please clarify this matter. <br />Exhibit B - <br />1. How will sediment from the road be kept from moving into the Arkansas <br />River (which is to be 50' away)? Will a ditch be provided beside t e road? <br />2. Given a depth to ground water of only 1', I do not understan how a <br />front-end loader can be used to mine the site to a depth of 12' unl ss the pit <br />is dewatered. If the material is mined wet with a dragline, this i a <br />workable system. Otherwise, dewatering and a NPDES permit will be equired. <br />Please clarify these plans. <br />3. It is not clear to me why no topsoil material can be salvage in an <br />alluvial area such as this. Please clarify your plans and justify his lack <br />of topsoil salvage. Your soils description is inconclusive as cone rns the <br />potential for some growth medium salvage on site. - <br />