Laserfiche WebLink
• <br />Areas Involved In Monitoring Program <br />o Eckman Park Mine, Mine #1 <br />o Mine # 2 <br />o Mine # 3 <br />APPROACH <br />Phase 1 - Survey of Backfill Areas <br />OBJECTIVES: <br />Receiving Drainage <br />Foidel Creek <br />Fish Creek <br />Middle Creek <br />o Locate all areas of discharge from backfilled areas <br />o Characterize discharge areas with respect to: <br />- Hydrogeologic Setting (backfill/bedrock relationship) <br />• - Potential Recharge Area <br />- Present Flow Rate <br />- Present Water Quality Characteristics (temp,.pH, <br />conductivity) <br />o Divide backfill areas into logical monitoring units <br />o Select discharge areas for monitoring <br />o Document survey and prepare map (report may include <br />photographs) <br />o Repeat reconnaisance of backfill sites at Eckman Park <br />and Mine # 3 sites on an annual basis following spring <br />snowmelt. <br />SCHEDULE: <br />o Survey should be performed during May 1986 as this is <br />the period of highest spring discharges <br />• <br />