Laserfiche WebLink
<br /> <br />e) Appropriate techniques for insuring a diverse and long <br />lasting vegetative cover shall be employed. If necessary, <br />mechanical soil conditioning by discing, mulching and the <br />application of fertilizer will be implemented. <br />f) Topsoiling <br />Overburden will be removed pi <br />soil will be removed and <br />Stockpiled topsoil will 6e <br />erosion, <br />Woody vegetation at the site <br />prior to excavation within the <br />-ior to the mining process. Top <br />segregated from other spoil. <br />reserved from wind and water <br />will be segregated from topsoil <br />affected area. <br />Topsoil stockpiles will be stored as close to the affected <br />area being mined as practical. Special care will be given to <br />minimize the effects of erosion on the topsoil stockpiles. <br />Topsoil will be spread as required over pit wall slope and <br />floor areas in a single lift between 6 - 12 inches. If soil <br />quality proves to 6e unworthy of supporting native type <br />vegetation fertilizer will be added as per the recommendation <br />of the 5CS. <br />