'. <br />'" - <br />-. <br />'' <br />Brighton Water Storage Project <br />Slope Stability Calcalations <br />Adams Couoty, Colorado <br />Prior to filling, the top 12 inches of in-place materials on which fill soils will be placed should be <br />scarified, moisture conditioned and properly compacted to provide a uniform base for. fill <br />placement. Soils that classify as A-1 through A-5 (granulaz materials) should be compacted to 95 <br />or more percent of the maximum modified Proctor dry density at moisture contents within 2 <br />percent of optimum moisture content as determined by ASTM D-1557. Soils that classify as A-6 <br />and A-7 (cohesive soils) should,be compacted to 95 percent of the maximum standard Proctor <br />density at moisture contents from 1 percent below to 3 percent above the optimum as determined <br />by ASTM D-698. If surfaces to receive fill expose loose, wet, soft or otherwise deleterious <br />material, additional material should be excavated, or other measures taken, to establish a firm <br />platform for filling. , <br />Fill materials should be thoroughly mixed to achieve a uniform moisture content, placed ins <br />uniform lifts not exceeding 8 inches in loose thickness, and properly compacted. Soils that <br />classify as A=1 through A-5 should then be-compacted to 95 or more percent of the maximum <br />modified Proctor dry density at moisture contents within 2 percent of optimum moisture content <br />as determined by ASTM D-1557. Soils that classify as A-6 and A-7 should be compacted to at <br />,least 95 percent of the maximum standard Proctor density at moisture contents from 1 percent <br />below to 3 percent above the optimum as determined by ASTM D-698. - <br />The Gebtechnical Erigineer should observe the exposed excavation surface prionto placement of <br />fill, and observe earthwork operations and test the soils. <br />Excavation Considerations Test holes for subsurface exploration were advanced to the depths <br />indicated on the test hole logs by means ofbuck-mounted, flight auger equipment. We anticipate <br />no unusual .excavation difficulties-for the proposed embankment in these materials with <br />conventional, heavy,-duty excavating equipment in good working condition. , <br />Groundwater was encountered during subsurface exploration at depths of about 18 to 27 feet <br />below existing grades at top-of-slope. The -shallow groundwater conditions are interpreted to <br />indicate that the water was perched in the sands and gravels; on the relatively low permeability <br />bedrock. The sands and gravels are relatively permeable and should drain comparatively rapidly. <br />Likewise, local groundwater will tend to flow toward the site relatively rapidly aftar-site water <br />levels are lowered. The Contractor should take care to ensure a drained condition during project <br />excavations and pond wall construction. Active dewatering systems may be prudent. Seepage <br />will significantly reduce factors of safety below those values discussed above for the temporary <br />slope geometries. <br />Job No. 02-0065 Ground Engineering Consul[an[s, Inc. <br />Page 4 <br />