Laserfiche WebLink
<br />Colorado Division of Minerals and Geology sheet 1 of 2 <br />_________________________________________ <br />ESTIMATING FORM - EQUIPMENT MOBILIZATION / DEMOBILIZATION <br />Task p... ] Prep. by ESC Filename..M058-] <br />____________ ________ __________ <br />Date..... JO-OC[-98 Permit p M-98-050 Mine. .....Tellier Gravel Pit <br />____________ ________ __________________________________________________________________ <br />Permit Action........ New 112 Permit Application <br />______________________________________________________________________________________________ <br />Task Description..... Mobilization/Demobilization <br />______________________________________________________________________________________________ <br />HOURLY EQU ZPMENT COST <br />Mob/Demob Eqp. -Tractor <br />-Lt. Trailer <br />-Med. Trailer <br />-Hwy. Trailer <br />-Pilot Car <br />-Hyd. Crane <br />-Fuel Truck <br />-LU be Truck <br />-Flatbed Truck <br />NO'CE - This is a list [o select from, not a list of mandatory items to include. <br />6x4, 75,000 16 GVW, 375 HP, diesel powered <br />2E con folding gooseneck, drop deck <br />50 ton folding gooseneck, drop deck <br />120 Ton folding gooseneck, drop deck <br />On-highway light duty truck, 4x2, 130 hp, 1/2 ton rating, gasoline powered <br />Grove RTSBE rough terrain hydraulic crane, 20 ton capacity, 125 hp, 7o fc. boom <br />6x4, 3,600 gallon capacity, 210 NP, diesel powered <br />6x9, 2,500 gallon capacity, 210 HP, diesel powered <br />30,000 16 GVW, 210 HP, diesel powered <br />Last UPdate: _______________________________________________________________________________ <br />August, 1997 Itncks) <br />--" """ "'---" "' Lc. Rig Med.Aig Hvy.Hig Pilot Hydraulic Fuel <br />Cost Breakdown: c=2E T. 26-60 T. > 50 T. Car Crane Trvck <br />Ownership Cos[/hr = $25 .59 $28 .10 531 .30 $1. 73 <br />Operating Cost/hr = $28 .38 $30 .1] $32 .39 59. 82 <br />Operator Cost/hr = $22 .61 $22 .61 $22 .61 $21 .82 <br />Helper Cost/hz = $21 .82 521 .82 $21 .82 $0 .00 <br /> Total = $98 .90 $102 .70 $108 .15 $28. 37 <br />NON-ROADABLE EQUIPMENT <br />______________________ <br />Machine Description <br />Weight Ownership Haul Rig <br />(tons) Cost/hr Cost/hr <br />CAT DBN Dozer <br />CAT 30] Excavator <br />CAT 62 ]E Scraper <br />Revegetat ion Equipment <br />90.00 $43.60 $102.]0 <br />8.50 $8.83 $98.40 <br />46.50 $35.18 $102.70 <br />20.00 $60.00 $98.40 <br />524.12 <br />531.98 <br />$23.17 <br />$0.00 <br />5]8.]3 <br />Lube <br />Trvck <br />Flatbed <br />Truck <br />57. BB <br />$11.82 <br />$22.35 <br />$0.00 <br />$42.05 <br />$6. 88 $12. 66 <br />$19. 5] $25. 56 <br />$22. 35 $21. 29 <br />$0. 00 50. 00 <br />$48. <br />_____ 80 <br />__ $59. <br />_____ 46 <br />__ <br />Fleet Site Haul Trip <br />(no. hauled) Cost/hr <br />1 5146.30 <br />1 $107.23 <br />1 $137.88 <br />1 $158.90 <br />Return Trip DOT Permit <br />Cost/hr Cost/ea <br />.___$102 v70______________ <br />$98.40 <br />$102.]0 <br />598.40 <br />Subtotals $549.81 $402.20 50.00 <br />_________ _________ _________ <br />