My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE61855
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE61855
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:08:22 PM
Creation date
11/20/2007 7:19:10 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1995038
IBM Index Class Name
Permit File
Doc Date
8/28/1995
Doc Name
RECLAMATION COST SUMMARY FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />D02ER / RIPPER COST 8 PERFORMANCE DATA WORKSHEET con['d <br />Model Cat D7G <br />ADJUSTED COST SUBTOTALS <br />-------------------------- Ou'urship Costs <br />Dozer, ROPS Cab 8 Ripper: <br />Single shifts 515.81 f10.61 <br />Double shifts 511.86 f5.31 <br />Triple shifts (10.55 53.53 <br />sheet 2 of 2 <br />_____I___________________ Overhaul g Operet irg Costs ______.__________-___ <br />Dozer 8 ROPS Cab: <br />57.74 53.01 59.29 53.72 f7.50 f7.33 f2.26 f0.00 f0.98 <br />f3.87 Ripper: <br />52.58 50.34 f1.30 f0.56 f1.35 50.00 f0.22 50.00 f0.88 <br />HOURLY OPERATOR PAGES <br /> Base Fringe F.I. C.A Unenpl. Wk. Conp. Total ~ Shift <br />CCA Classification <br />____ <br />___ Rete Benefits ~ 7.70% 6.20% 12.50% (S/h r)~ Differential <br />_________ <br />_______ <br />Dozer Oper.c 70hp: ___________ <br />f14.32 ______________ <br />f3.96 ___________ <br />f1.10 ________ <br />f0.89 ________ <br />51.79 _______I <br />f22.06 ~ __.____________I <br />Day 50.00 ~ 2 shift/day avg.: f0.15 <br />Dozer Oper.>=70hp: f15.02 53.96 51.16 50.93 f1.88 522.95 ~ Swing: f0.30 ~ 3 shift/day avg.: f0.25 <br />Mechanic (15.32 f3.96 51.18 f0.95 51.92 (23.32 ~ Night: 50.45 <br />HOURLY EOUI PMENT COST SUMMARY <br /> Ownership ~ Operating 8 Overhaul Costs ~ Operator ~ Total <br /> Costs ~ Dozer Ripper ~ Costs ~ Cost/HR (S) <br /> Single shifts: 534.16 534.10 f4.64 522.95 (95.84 <br /> Double shifts: f21.03 534.10 54.64 f23. 10 f82.86 <br /> Triple shifts: f16.66 534.10 f4.64 (23.20 578.59 <br /> <br />________________ <br />________________ <br />EOUI PMENT SPECI _________ <br />_________ <br />FICATIONS ______________________ <br />______________________ ____________ <br />____________ _______ <br />_______ ________________ <br />________________ _______________ <br />_______________ _____________________________ <br />_____________________________ <br />BULLDOZER : Transmission Yei ght Length Width Height Fuel Horsepower <br />Description Type (tons) (f t.) (f t.) (f t.) Type (FHP) <br />Cet D7G Pouershift 19.0 77.3 8.4 10.5 diesel 200 <br />BLADE <br />Description <br />STRAIGHT <br />____________________________ <br />Weight Capacity Width Height <br />(tons) (cy.) (ft.) (ft.) <br />3.8 5.5 12.0 4.2 <br />TRAVEL SPEEDS: <br />(mph) first secorxf third <br />Forward: 2.3 4.1 6.2 <br />Reverse: 2.8 4.9 7.6 <br />REAR RIPPER Height No. of Ripper Shank Beam Wid[h <br />Description Type (tons) Shanks Spacing (ft.) (ft.) <br />3-shank ripper Parallelogram 3.3 3.0 3.3 6.5 <br /> TOTAL MACHINE SHIPPING WEIGHT 26.1 tons <br />Max. Digging <br />Depth (f t.) <br />________________ <br />2.4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.