My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE61855
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE61855
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:08:22 PM
Creation date
11/20/2007 7:19:10 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1995038
IBM Index Class Name
Permit File
Doc Date
8/28/1995
Doc Name
RECLAMATION COST SUMMARY FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Colorado Division of Minerals and Geol o~ <br />ESTIMATING FORM - BULLDOZER NORK <br />Task M: 2 Prep. by: JD <br />Date: 08/28/95 Permit #: X95038 <br />Permit Action: Final Reclamation <br />Task Description: Replace Topsoil <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D7G <br />Blade Type: STRAIGHT <br />Attachment q1: ROPS Ceb <br />Attachment i12: N/A <br />Horsepower: 200 <br />Shift Basis: 1/day <br />Cost Breakdown: <br />-------------- Utilization X <br />Ownership cost/hr = f29.33 N/A <br />Operating 8 overhaul cost/h r- dozer = f34.10 100 <br />-ripper = 50.00 N/A <br />Operator cost/hr = 522.95 N/A <br />Total egpt. unit cost/hr = f86.37 Total fleet cost/hr: f86.37 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />Volume: 2,151.0 CCY Factor: 1.125 Volume: 2,419.9 LCY <br />Source of quantity take-off: Calculation <br />Source of est. swell factor: Program <br />HWRLY PRODUCTION <br />_________________ Job Condition Correction Factors <br />Avg• push distance: 250 ft. --------------------- ----------- <br />- -------- Operator.......... 0.75 (avg.) <br />Unadjusted hourly Mat. consistency.. 1.00 (Cat tbL) <br />dozer production: 199 LCY/hr Dozing method..... 1.20 (slot) <br />- -------- Visibility........ 1.00 (avg.) <br />Material consistency: Job efficiency.... 0.83 (1sh/day) <br />Consolidated stockpil e Spoil pile factor. 0.90 (ssd-fc) <br />--------------------- ---------------- Push 9radient..... 1.22 (Cat tbl) <br />Avg. push gradient: 10.00 X (nag) Altitude deration. 1.00 (Cat tbl) <br />- -------- Materiel weight... 1.00 (Cat tbl) <br />Avg. site altitude: 7340 ft. Blade type........ 1.00 (S, SU,U) <br />Materiel weight 2300.00 lb/LCY Net Job Correction 0.82 <br />Mat. Descr.: - -------- ----------- <br />GENERAL FILL Adjusted Unit Prod.: 164.19 LCY/hr <br /> Adjusted Fleet Production: 164.19 LCY/hr <br />JOB COST ----------- <br />Flee[ size 1 Dozers) Total Job Tine: 14.74 Hours <br />Unit Cost SO-526 /LCY Total Job Cost: f1,273.00 <br />Task File Name: M038-2 <br />Mine: Spor <br />
The URL can be used to link to this page
Your browser does not support the video tag.