My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE61782
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE61782
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:08:19 PM
Creation date
11/20/2007 7:18:06 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980001
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Doc Name
SEDCAD Channel Designs
Section_Exhibit Name
3.5 APPENDIX 3.5-E
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
cross-overs are surface dips notched into the road <br />surface to carry channelized flow. Inslope drainage <br />down gradient from the water cross-over will be <br />allowed to migrate across road at 1B to the inslope <br />drain at 2B. <br />Segment 2 (2A to 2B): <br />Drainage Areas - Disturbed Area 2A <br />Disturbed Area 6 <br />Undisturbed Area lA <br />Drainage Control - Inslope drain using road width for containment. <br />Road width used for calculation 12.5'. <br />Segment 3 (3A to 3H): <br />Drainage Areas - Disturbed Area 2A <br />Disturbed Area 6 <br />Undisturbed Area lA <br />Drainage Control - V-Ditch on inslope with run-out channel to release <br />drainage, Although drainage areas for this segment <br />are considered disturbed (modeling nomenclature) all <br />drainage consists of road surface areas. The runout <br />channel will have the same configuration as the ditch <br />except it will be deepened to have a freeboard of 1 <br />ft. Four loose rock filters will be placed in the <br />runout channel to dissipate water velocity. Rock <br />filters will be constructed to a height of ditch <br />design flow depth. Freeboard not filled with rock <br />material to enable flow to pass should rock filters <br /> become plugged with ice and sediment. The additional <br /> freeboard is provided to ensure that the design flow <br /> and required freeboard is maintained in the event of <br /> the rock filters becoming plugged. <br /> Segment 4 (4A to 4B): <br /> Drainage Areas - Disturbed Area 7 <br /> Undisturbed Area 23 <br /> Disturbed Area 8 <br /> Drainage Control - Inslope drain using road width for containment. Road <br />• <br /> 3.SF-4 May 14, 1993 <br />
The URL can be used to link to this page
Your browser does not support the video tag.