Laserfiche WebLink
QUARRY CROSS-SECTION l•l i~~ -NOT TO SCALE- <br />easT-~ West Side East Side <br />~--------------------r <br />NC <br />~s' ~ 15, eta.`:. #_14_..,_.-__•__,,:. _ u 11 _ ow ua .snot a 3 ' sna n 4 :" a5, etc. !/ <br />~t2'±\ •:_ BENCH # 2 i~/. ± /ttoriz. ro <br />1 \ n 24 etc ` `•, x 19 a 20 ' n 21, etc. t /vemcar <br />~ _ ~ backwall slope <br />Dakota~~sandst0:ne BENCH #3 `~•. a40 a41 etc. I <br />I <br />mudstone ~ <br />- --- - --_ <br />---- ----- i o w- g r a d e c o a I __ ---- ----- - ---- ---- --- --- <br />mudstone <br />A 25-foot set-back natural berm from the Kernan <br />(McElmo Cr.) Canyon wall will be leR in-place at <br />the south edge of both the East Side and West side <br />extraction areas. Only the 170-foot wide throat of <br />the pre-quarry area will connect the excavated <br />quarry area through the south wall of the mesa <br />slope (for all three bench elevation excavations). <br />The first bench will be completed in a similaz <br />manner on the West Side of the old quarry until <br />the west and north boundaries are reached, <br />utilizing the worked-out East Side quarry floor for <br />processing and stockpiling. When extraction of <br />the first bench for the West Side is completed, <br />then extraction of the SECOrm BENCH will be <br />started in the area of the previous quarry at the <br />south edge of the mesa and it shall be completely <br />extracted in a similar manner. <br />rot <br />It is estimated that the North Extension and the <br />East Side Filtsr BENCH will be completely <br />extracted within the first four years of operation <br />(Yr-2006-'09), depending upon the market <br />demand for road and other construction gravel, <br />and rip rap. That accounts for a surface area about <br />9 acres of the NORTH QUARRY extraction area. <br />The remaining West Side of the FIRST BENCH is <br />expected to take from four to five more years to <br />completely extract. After that, if the Earth has not <br />begun another Glacial Period by that time, the <br />Second Bench extractions will commence, <br />followed by the third bench in a similaz manner. <br />SEQUENCE BENCH AREA <br />(Hight' variahle <br />depending ar market <br />condNions <br />Begin Yr-'06 N. QUARRY North Ertraction (N. of old quarry)'/+-acre (15,000 CY) shots <br />Yr-`07 FIRST <br />Yr-`08 East Side -southwest comer to northeast wrner in 12' x'/. -acre shots <br />Yr-`09 BENCH <br />Yr--' 10 to ' I S West Side -east to west in 12' x'/ -acre shots <br />Yr-2016 to N. QUARRY South-Central & East Side (Pre-Quarry area) to northwest comer in 12' x'/, <br />`19 SECOND -acre shots <br />Yr- 2020 to West Side - SW comer old quarry floor, to NE wmer in 12' x'/. -acre shots <br />`24 BENCH <br />Yr-2025 to N. QUARRY South-Central & East Side (Pre-Quarry area) to northwest corner in 12' x'/. <br />29 THIRD -acre shots <br />Yr-2030 to Vest Side - SW comer old quarry floor, to NE corner in 12' x 3/. -acre shots <br />`34 BENCH <br />Yr - 2035 to gOUTHEAST QUARRY2 <br /> <br />1H3"[e0e -t4- ON01f2Appl HINOMARSN SANQ4TYN/E <br />