P-3 <br />Mining in the 5th phase will begin by backfilling over- <br />burden temporarily stored on the surface, back into the <br />area mined in phase 4. Next a portion of the topsoil <br />removed from the south side of phase 5 will be stock- <br />piled on top of the backfill in an orderly berm, followed <br />by a berm built from a portion of the overburden on the <br />south half of the 5th phase. Toward the north boundary a <br />similar process will be followed, creating two berms of <br />material. As in phase 4, mining will proceed from east <br />to west on a face almost 175' wide. When all mining is <br />completed (presently estimated to be 1995 - 2000) back- <br />filling and final grading will be completed as set forth <br />in the Reclamation Plan ( See Exhibit E - 1 ). <br />Exhibit C - Maps <br />1) See the Index Map identified as C-1. <br />2) See the Area Map identified as C-2. <br />3) See the Plot Sketch Map identified as C-3. <br />Exhibit D - Wildlife. Water Resources. Vegetation and Soils <br />1) See Exhibit D-1 for wildlife information. <br />2) See the original file and new information on Water <br />Resources in Exhibit D-2. <br />3) See the original file and new information on Vegeta- <br />tion and Soils in Exhibit D-2 and D-3. <br />'Exhibit E - Reclamation Plan <br />Reclamation will be completed in three general phases. <br />The first phase will involve backfilling along the granite <br />walls created in the first three phases of mining. Back- <br />filling should begin about the time phase 3 is completed <br />and when major preparation takes place for phase 4. The <br />overburden removed in the 3rd phase of mining will provide <br />adequate material (about 35,000 cuyds.) to backfill and <br />reshape the walls on the north and south sides of the area ~~~ <br />to a 3:1 or flatter grade. A haul road with switch-backs <br />will need to be maintained up the first three benches i <br />order to access the floor of the mine in the 4th and 5th <br />phases of mining. Consequently, topsoiling on [he benches <br />will be delayed until all regrading is completed as sho•N-n <br />in Exhibit E-1. <br />When mining is completed in phase 4, backfilling from <br />the subsoil storage area on phase 5, will begin. Also, <br />overburden stored on the south rim of phase 4 will be <br />distributed in order to establish the finished grade along <br />the south slope and bottom of the phase 4 area. <br />