My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE61716
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE61716
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:08:15 PM
Creation date
11/20/2007 7:16:41 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981033
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
EXHIBIT 17 STIPULATIONS & RESPONSES, BEAR NO. 3 MINE, 1982
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• STIPULATION N0. 9 <br />The Division Directs Bear Coal Company to perform proctor testing to <br />determine the moisture-density relationships of the materials to be <br />utilized in backfilling the Bear No. 1 and No. 2 mine portal areas. In <br />conformance with the recommendations of Rockv Mountain Geotechnical, <br />Inc., the materials shall be placed and compacted to achieve 95% of the <br />maximum proctor density, as determined in accordance with ASTM Standard <br />Test D-698. Further, Bear Coal Company shall submit a certified <br />inspection report to verify completion of backfilling and grading of the <br />Bear No. 1 and No. 2 mine portal areas in conformance with the approved <br />plan. This certified report shall be prepared by a qualified registered <br />professional engineer or professional geologist. The report shall be <br />submitted to the Division within 60 days of the completion of <br />backfilling and grading <br />STATUS OF STIPULATION NOS. 8 and 9 <br />Stipulation Nos. B and 9 were satisfied by response dated May 27 and <br />• July B, 1985. However, since that time ARCO has taken over the <br />reclamation liability for portions of Bear No. 1 and Bear No. 2. The <br />areas of responsibilities have been outlined in the "Bear No. 1 and Bear <br />No. 2 Reclamation Plan" in Exhibit 25. <br />STIPULATION N0. 10 <br />The Division directs Bear Coal Company to submit a detailed engineering <br />plan for the portal access road and portal facilities at the Bear No. 3 <br />Mine. for review and approval by the Division, no later than 30 days <br />following approval of the permanent program permit. This detailed <br />engineering plan shall include road and portal cross-sections, road and <br />portal plan and grade design drawings, and detailed engineering design <br />drawings for all retaining structures and drainage facilities. No <br />additional disturbance shall occur in the area of the portal access road <br />or portal facilities until these detailed engineering plans have been <br />reviewed and approved by the Division. <br />• <br />-5- <br />
The URL can be used to link to this page
Your browser does not support the video tag.