My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE61716
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE61716
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:08:15 PM
Creation date
11/20/2007 7:16:41 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981033
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
EXHIBIT 17 STIPULATIONS & RESPONSES, BEAR NO. 3 MINE, 1982
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C~ <br />July 8, 1982 <br />Mr. Dan T. Mathews <br />Mined Land Reclamation Division <br />Department of Natural Resources <br />1313 Sherman Street <br />Denver, Colorado 80203 <br />Re: Bear No. 3 Response to Clarification <br />of Bear No. 3 Stipulation Response <br />Dear Dan: <br />I appreciate your assistance in working with Eldon Strid and Jon Pratt <br />of this office regarding additional information needed on the <br />• stipulations for the Bear No. 3 Mine. The following responses are in <br />regard to the clarifications requested in your letter of June 22, <br />1982. <br />Stipulation No. 1 <br />I. Design and Layout of Treatment System <br />Method of Treatment <br />The method of treatment to be utilized by Bear Coal Company <br />will be a continuous application of pre-mixed flocculent or <br />coagulant. The typical design of the planned system is <br />shown on Figure 1. The location of the distribution point <br />is shown on the Drainage and Sediment Control Plan Map (Map <br />S-1). <br />B. Type and Dimensions of Mixing Chamber <br />The mixing of the coagulant will be completed in two stages. <br />Initial mixing of the coagulant with water will be completed <br />in the filter dam/dugout pond. The second portion of the <br />mixing will take place as the water flows through the Ditch <br />"D" into the sediment control structure. The filter <br />dam/dugout pond will be able to contain about 136 cu ft of <br />• water. The channel length in which mixing will occur is <br />approximately 170 feet. <br />
The URL can be used to link to this page
Your browser does not support the video tag.