My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-07-30_PERMIT FILE - C1981008A (43)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981008
>
2007-07-30_PERMIT FILE - C1981008A (43)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2020 1:34:44 PM
Creation date
11/20/2007 7:16:35 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008A
IBM Index Class Name
Permit File
Doc Date
7/30/2007
Section_Exhibit Name
Section 2.04.6 Geology Description
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
n <br />LJ <br />• <br />• <br />drilling converged on the OIU problem areas to better define and confirm the extent <br />of suitable, marginally suitable, and unsuitable material. Constituents which <br />approached or exceeded guideline levels during the Phase I sampling were included <br />on the Phase II analyses list. Modifying the second phase parameter list was <br />desirable to reduce unwarrantable analyses costs and to focus on site specific <br />conditions. <br />Sampling Methodology -Phase 1 <br />Intensity. Most OIU sampling and analysis studies indicate that drilling designs should be <br />governed by geological factors, such as the lithologic variability and the depositional environment <br />of the OIU strata (Barth et al., 1981). Barrett et al. (1980) states that drilling designs and hole <br />spacings must be determined on the basis of the unique set of geologic and geochemical <br />conditions (i.e., lateral variability of strata) existing at each mine site. <br />Recommended drilling intensities range from 1 hole per 40 acres to 1 hole per 640 acres. DMG <br />(1982) suggests sampling 1 drill hole/640 acres with a minimum of 3 holes/site. USDI-OSMRE <br />(1985a) recommends drilling 1 hole/160 acres with a minimum of 3 holes/site. WDEO (1985) <br />stipulates sampling 2 core holes and 6 cuttings holes per 640 acres during Phase I drilling. Phase <br />II sampling is reserved for special handling situations and a density of 1 hole/40 acres is <br />recommended. Dollhopf et al., (1981) recommends a 600 meter grid (1 hole/90 acres) for initial <br />characterization followed by additional drilling and analyses if any parameters of concern are <br />indicated in the initial drilling. The circular zone of data extrapolation or the effective drill hole <br />radius should be 750 feet. Lastly, Sutton et al. (1981) recommends sampling one site to <br />adequately assess overburden variability on small permit areas of less than 40 acres. <br />A Phase I drilling program was implemented at New Horizon 2 in 1984 to describe overburden, <br />interburden, and underburden characteristics over the entire study area, to obtain representative <br />core hole locations from which cross sections could be developed, and to define the extent of <br />suitable, marginally suitable, and unsuitable material. Three strategic and systematic drilling <br />locations, spaced at 2,000 and 3,000 feet apart, were selected after evaluating the geologic cross <br />section requirements and existing coal cropline/recovery information. Overburden (defined as all <br />REVISED Auguat 2006 2.04.6-14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.