Laserfiche WebLink
<br />• <br />• <br />Monthly rill and gully inspections will be conducted from March <br />through ,Lune and in August and November of each year until a <br />strong vegetative cover exists on the reclaimed areas.Inspections <br />will also take place within 7 days of a signifigant rainfall <br />event (.25 inches or more ). As conditions allow, repair will <br />begin within 10 days of the inspection. Full repair will occur <br />within 30 days of the inspection . weather permitting. If weather <br />conditions prevent permanent repair, hay bales will be driven <br />into the gullies for temporary stabilization. <br />Inspection forms will be filled out far <br />be kept on file at a location in Meeker <br />next 30 days. A summary report will be <br />report to the Division. <br />each inspection and will <br />to be determined in the <br />included with the annual <br />C~~ <br />/ // /~/ il~as~.sc; <br />