Laserfiche WebLink
..~a~~ <br />Page 2 Continued <br />(d) N/A <br />(e) N/A <br />EXI-IIBIT D- Reclamation plan <br />(2) Cost of reclamation. <br />(a) Rental of Case loader 621 includes transportation, rental, <br />fuel, insurance, etc. for 3 days $1,700 labor $ 500.00 <br />(b) Seed and mulch $ 150.00 <br />Office cost if needed $ 435.75 <br />Administration cost $ 117.50 <br />Total- 2902, 25 <br />CD $1575.00, FS bond $500.00, Adjustment $827.25+- <br />