Laserfiche WebLink
C~ <br />time. Time lag between the initial spoil grading would be <br />four spoil ridges, to allow the operation to run smoothly <br />and prevent any safety problems because oC congestion and <br />equipment. <br />The spoil grading would be done in a xay to minimize erosion <br />and not adversely affect water rights or water quality. <br />Ridges would be created across slopes for moisture <br />retention, created on the contour at a 3:1 or 5:1 ratio. <br />Terraces would be created on any areas where erosion mig^t <br />occur. Sma11 check Cams would be built in areas of heav:: <br />runoff, reducing runoff and 'erosion and creating water holes <br />for wildlife and domestic stock. Creating several water <br />• holes would accomplish better range use since animals <br /> congregate near water. The water impoundments would not <br />interfere with mining nor damage property, and they would <br />meet all state and federal standards. <br />There would be no toxic or acid producing material deposited <br />in the pits or near any drainages. All oils and greases <br />would not be put in the pits or near any drainage. All oils <br />and greases would be put in holding ponds near the shop and <br />used on the roads as dust suppressant. All refuse, such as <br />cans,•uood, paper, etc., would be buried in the pits. After <br />mining and reclamation, there would be no refuse on the <br />affected lands. All spoil piles xould be at least 100 Feet <br />• <br />14 <br />