Laserfiche WebLink
EY.HIBIT.C - Mining plan <br />t. Dates of Minin6, be(yinning and end. <br />The plan is to begin iming in this area as soon as the permit <br />is received. The best estimate of the road foreu~an is that <br />the supply will last for 20 years as the present rate of use. <br />2. Descrlptlon of depth of top soil & how stored. <br />As this is a creek bed operation there will be no topsoil. <br /> <br />3. Description of overburden <br />As this is a creek bottom operation there is no overburden. <br />4. Thickness of Gravel layer. <br />Testing indicates that the gravel depth is six to eight feet. <br />S. Description of roads to & troy pit - Show on map - Ex E <br />Gounty road "0" borders on the west side of the area, so <br />there is really no road into the pit area. <br />6. Show disturbance to land surface. <br />The only disturbance to land surface will be to the stream <br />bed itself which will have gravel extracted to a depth of 6' or sc <br />Possibly some of the bank will be used to stockpile gravel. <br />~. Show dimensions of existing and proposed roads that <br />will be used. <br />No new haul road will be built. The pit area borders the <br />county road. <br />8. Specify how much water will be used, 1f any. <br />Water will not be used in this opera <br />be washed. kill be used directly as <br />9. Deserlbe any bround water and/or the <br />Ground water in the area will not be <br />Stream flow in times of flood should <br />lion. Gravel will not <br />mined. <br />affect. <br />affected by this operation. <br />not be affected. <br />10. Describe if will comply with Colorado Plater Laws. <br />There will be no conflict with Colorado Water Laws. <br />11. Deserlbe whether Gravel will be processed on cite. <br />Gravel will not be processed on the site. Neither graded <br />or washed. <br />