Laserfiche WebLink
At the current production level of 700,000 TPY, one shift is being <br />• utilized to truck coal from the vicinity of the mine to the silos and train <br />loadout. During the period of traffic count data collection (September), <br />coal was being trucked during the 7 A. M. to 3 P. M. shift, Monday through <br />Friday. At the proposed production level of ].3-mil]ion 7PY, two shifts <br />will be utilized to truck the coal. <br />Stevens Gulch Road is maintained for the County by CWI. Hence, adverse <br />weather conditions on the steep grades is minimized. <br />_• <br />f <br />f~ <br />u <br />L. <br />11 <br />u <br />-5- <br />