Laserfiche WebLink
• EXPLANATORY ADDENDUM <br />EXHIBIT D1 SNYDER <br />MINING TIMETABLE <br />I-2 - More Specific Mining Timetable <br />RESPONSE I-2: As explained in the narrative, the mining <br />process at this quarry cannot be meaningfully divided into phases. <br />The previous plan which did present phases and was adaptable to a <br />more precise timetable, unfortunately, did not correspond with what <br />will actually be done when a large time frame must be considered. <br />Therefore, the cyclic timetable was presented as best representing <br />the on-the-ground, actual sequence of events. This is the least <br />' • cumbersome way to state it and although it is not conveniently <br /> displayed on a map can be visualized in the narrative. In essence, <br />more precision in the timetable would result in less precision about <br />what will actually be done. <br />• <br />S-D1-1* <br />