My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE61277
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE61277
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:07:55 PM
Creation date
11/20/2007 7:06:47 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2003021
IBM Index Class Name
Permit File
Doc Date
6/28/2003
Doc Name
Cost Summary Form
From
DMg
To
Environmental Alternatives Inc
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
sheet 1 of 2 <br />CIRCES Cost Estlmatina Software <br />Task # <br />Date <br />User <br />Agency or organization name : DMG <br />002 State :Colorado PermiUjob # : M-2003-021 <br />Ofa/25J2003 County:Fmmont Abbreviation :none <br />JOf Site :Ranch Land Rock Pit #2 Filename : M021-002 <br />Permit or otherjob action :Phased reclamation <br />Task description :Replace topsoil <br />HOURLY EQUIPMENT COST Shift basis : 1 per day <br />Truck/loader team -Track :Generic 12-18 cy, 6x4 <br />-Loader :CAT 980G <br />Support equipment -Load area <br />-Dump area <br />Road maintenance -Motor grader <br />-Water truck <br />Cost Breakdown : mck/LOader Work Team <br />Track Loading Tool Support Equipment <br />Load Area Dump Area Road Maintenance Equipment <br />Motor Grader Water Truck <br />Import data filename : truck2 loader NA NA NA NA <br />Utilization-machine : 100 84 NA NA NA NA <br />-Ripper attachment : NA NA NA NA NA NA <br />Ownership cosf/hour: $20.33 $33.32 NA NA NA NA <br />Opereting cost/hour: $27.50 $35.66 NA NA NA NA <br />Ripper op. cosUhour : NA NA NA NA NA NA <br />Operator cosUhour : $21.72 $30.84 NA NA NA NA <br />Unit subtotals : $69.55 $99.81 NA NA NA NA <br />Number of units: 2 1 0 0 0 0 <br />Group subtotals : Work : $238.91 Support : $0.00 Maintenance : $0.00 <br />Total work team cosUhour : 5238.91 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 32,267 CCY factor: 1.215 volume: 39,204 LCY <br />Material weight : 1,600 poundslLCY Struck volume <br />Descr.: Top soil Heaped volume <br />Rated payload : 50,300 pounds Average volume <br />Payload capacity: 31.44 LCY Adjusted volume': <br />Final truck volume based on number of loader passes <br />• Wck volume atljusted to not exceed mtetl payloatl or neapetl volume <br />12.00 LCY <br />18.00 LCY <br />15.00 <br />18.00 LCY <br />LCY <br />14.70 LCY <br />Loading Tool Capacity : ob Condition Corrections : Site altitude (a.) <br />Rated capacity (nom. heaped) : 7.000 LCY Track Loader <br />Descr.:Other-moist loam (100-110%) Altitude adj.: 1.000 1.000 <br />Bucket fill factor : 1.050 Job efficiency : 0.830 0.830 <br />Adjusted bucket capacity : 7.350 LCY Net correction : 0.830 0.830 <br />
The URL can be used to link to this page
Your browser does not support the video tag.