Laserfiche WebLink
- ~ ~ - • • iii ~ii~in~iiiiiiii <br />999 <br />A-G-R-E-E-M-E-N-T <br />THIS AGREEMENT is entered into this 2® day of_~~tyal,,ry <br />1974 by and between THE STATE OF COLORADO, by and through i.ts <br />Director of Natural Resources and the Land Reclamation Boax•d <br />(hereinafter referred to as "State") and COOLEY GRAVEL COMPANY <br />(hereinafter referred to as "Cooley"}. <br />WITNESSETH: <br />WHEREAS, Cooley desires to operate a Rock mine in <br />Sections 10, 11 & 15, TSS, R70W, Jefferson County, Colorado, <br />better known as the Morrison Mine, and <br />WHEREAS, Cooley has submitted a plan on the Proposed <br />Land Stabilization and Reclamation Procedures for the proposed <br />Morrison mine operations; and, <br />WHEREAS, Said Morrison mine will be operated for the <br />purpose of extracting rock for commercial marketing and, <br />WI-IEREAS, The Colorado Open Mining Land Reclamation Act <br />provides statutory authority for the Land Reclamation Board of <br />the State of Colorado to enter into agreements with operators or <br />persons in charge of mining operations such as those contemplated <br />by Cooley to insure that the necessary stabilization and <br />reclamation work will be done to prevent landslides, floods or <br />erosion. This section of the law further provides that the Land <br />Reclamation Board requires a performance bond conditioned upon <br />the faithful performance of the stabilization work required by <br />the Board; and <br />WHEREAS, The Land Reclamation Board has determined that <br />the mining operation to be conducted by Cooley in said Sections <br />10, 11 & 15 could have an adverse affect on the environment and <br />could result in landslides or erosion if proper stabilization <br />and reclamation procedures are not followed. <br /> <br />