My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO26737
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO26737
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:46:11 PM
Creation date
11/20/2007 7:03:13 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
Hydrology
Doc Date
6/15/2001
Doc Name
2Q 2001 Sediment pond inspection
Permit Index Doc Type
SEDIMENT POND INSPECTIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
._ .::~ <br />. - <br />` BASIN RESOURCES,' INC. , <br />SEDIMENTATION POND INSPECTION FORM <br />Pond /'/~ ~ Fa.r.~.~-~',p~c,:` NPDE$ No. O~ <br />Date of Inspection ~ U r,x , /~ : 7~-~ <br />EMBANKMENT _ <br />1. Adequacy of the vegetative cover: Excellent, odemt Few, Poor <br />2. Erosion forming gullies: Extensive; Some, ery etv, None <br />3. Ls wave action causing erasion: <br />On the upstream embanktent? Yes No ~ <br />At the principal spillway inlet? Yes No c_-- <br />4. Erosion of the downstream toe of the embankment? Yes No ~ <br />The cause of the erosion is attributed [o: <br />5. IS seepage occurring through the dam? Yes No 1r <br />Could this seepage cause potential insmbiliry? Yes No <br />E.rplain: <br />PRINCIPAL SPILLWAY <br />1. IS the principal spillway system in working order? Yes ~' No <br />2. Is the inlet free of debris and resrictive material? Yes L No <br />3. Is the discharge outlet free of restrictive material? Yes (~ No <br />a. Is erosion occurring at the discharge outlet'? Yes No y <br />Evaluate the severity: E~Tensrve Moderate Just Starting None <br />EMERGENCY SPILLWAY <br />1. is the overall emergeny spillway system capable of passing design storm discharge? <br />Yes ~~ No <br />2. Does it appear as if the emergency spillway has discharged water since the last inspection? <br />Yes No <br />3 Is erosion occurring at any section of the emergency spillway? Yes No ~/ <br />Describe the extent: <br />SEDIMENT STORAGE CAPACITY <br />1. Has the design storage capacity of the reservoir been ,wpassed? <br />If yes, explain: ~~wJ r s /~-<..r <br />Yes No `~ <br />Please add any special comments concerning potentially dangerous/p/robl`e~m~s an the ba~cl/t of this <br />sheet! p / ~l~ '~~~~/G~ /r~~ <br />Ins erred by: .~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.